We have been bad about posting for the last couple of weeks. Not too much has happened. All the punch list times were completed, but since that time the sink has developed flow problems (swollen prostate likely), one electric fixture stopped working, and the only door created (laundry room) sticks now.
The trades arrive tomorrow for the plumbing and door. I will point out the electrical at that time. Today or tomorrow I will upload some more pictures.
Remaining for us to do...
1. Hang pot rack
2. Caulk the backsplash Leslie and I installed
3. Repair some of the point work on the bricks using a concrete caulk that dries to an almost exact match of the old mortar.
The trades arrive tomorrow for the plumbing and door. I will point out the electrical at that time. Today or tomorrow I will upload some more pictures.
Remaining for us to do...
1. Hang pot rack
2. Caulk the backsplash Leslie and I installed
3. Repair some of the point work on the bricks using a concrete caulk that dries to an almost exact match of the old mortar.

1 Comments:
..."We have been bad about posting for the last couple of weeks."
I think maybe!
Pixie's Pop
Post a Comment
<< Home